资讯

PJM drops Oklo advanced nuclear project from interconnection study cycle

UtilityDive·2026/8/31 13:20:51🔗 原文

📌 概要

Oklo asked the Federal Energy Regulatory Commission to order the PJM Interconnection to reinstate its 750-MW, mixed-technology project. PJM reportedly told Oklo that it never showed the project could

⚡ 关键要点

  • Oklo asked the Federal Energy Regulatory Commission to order

Oklo asked the Federal Energy Regulatory Commission to order the PJM Interconnection to reinstate its 750-MW, mixed-technology project. PJM reportedly told Oklo that it never showed the project could ride through a sudden drop in grid voltage.